Vinyl Liner Replacement

Aqualon have been replacing vinyl liners for inground pools for over 20 years, and Keith has been in the industry for over 30 years.

All liner & tile work is done by Aqualon – no subcontractors.

We are a family owned & operated business, and we aim to make your pool renovation an exciting & hassle free experience.

Replacing your liner generally takes about 2 weeks from start to finish.  Works usually progress as follows:

Day 1 – Drain the pool, remove the liner & any liner retaining strip that needs replacing, access & begin work on the pool shell.

Day’s 2-4 – Supply & fix any new retaining strip required, grind the pool shell to ensure a smooth finish against your new liner, any surface cracks in your pool shell are prepared & filled, begin building any additional steps required, begin preparation for tiling/regrouting etc.

When your replacing or renovating your pool it is a good time to make your your skimmer box is in good condition & not cracked and leaking.

The stepout on this pool was very large & intruded on the entertainment area.  The step was filled in & paved over, and the coping & facia reformed along with an additional 2 steps added.

This all varies from pool to pool as to your requirements.

More often that not your pool will be prepared in a few days & measured for your new liner.

Aqualon supply & recommend ABGAL liners, manufactured locally at Crestmead, and come with a 10 Year Pro Rata Warranty.

Manufacture of your liner usually takes 5-7 days, but this can vary during busy periods.

Call us today for a quote – we are happy to come out to look at your pool on a Saturday morning if your not available during the week.

Call Keith on 0403 504 459
or
Cathy on 0421 713 646

or email enquiries to keith@aqualon.com.au